Skip to content
King Service
Construction and new builds

Technical installations do not delay the build. They delay sign-off.

Electrical and HVAC installations for new builds and refurbishments across the Algarve, delivered to the contractor's programme with certification ready for inspection.

What we hear most often

  • Technical trades entering the programme too late
  • Certification still outstanding on the day of inspection
  • Coordination between electrical and HVAC falling to the client
  • Design changes carried out without a revised quote

On a building site the technical trades are among the last to arrive and the first to be blamed when sign-off slips. We work the other way round: we enter the programme at design stage, so the electrical infrastructure and the ductwork are accounted for before the walls close.

We deliver the distribution board, lighting, power and data infrastructure, and the complete HVAC system — VRF, chillers, split units and mechanical ventilation with heat recovery — on new builds and refurbishments alike. The crew is ours, with no subcontracting, so the programme we agree with the client or the main contractor is the programme the crew works to.

Certification runs alongside the work rather than after it. Whoever takes handover also takes the full technical file: drawings, test results and declarations, ready for inspection.

Work delivered in this sector

Request a technical audit before the next breakdown picks the time

A free site visit, a written report within days. No obligation to hire us.