Equipment 1
Climate control first fix across all 14 units
Equipment 2
Air conditioning in bedrooms and living rooms
Equipment 3
Unit boards, main switchboard and common areas
Equipment 4
Electrical infrastructure for the car parks
Units with electrical and climate work delivered
14

The challenge

In a residential building put up from scratch, the electrical and climate installations have to track every phase of the build and stay coordinated with structure, plumbing, finishes and the other trades. At Veram Apartments, King Service came in from the early phases to deliver both trades as one job.

The work

Climate control first fix was carried out across all 14 units, preparing the infrastructure for bedrooms and living rooms, with the air conditioning equipment installed afterwards. In parallel, the building's entire electrical installation was delivered: apartments, unit boards, main switchboard, car parks and common areas.

The outcome

The project was followed from the initial infrastructure through to the completion of the installations. With electrical and climate work under the same technical team, coordination between trades stopped depending on meetings between separate companies.

Work delivered for Veram Apartments, Faro in Faro — image 1 of 2Work delivered for Veram Apartments, Faro in Faro — image 2 of 2

Want a result like this on your site?

Request a free technical audit — we visit your site and deliver a written report within days.