High-end villa, Algarve
Installed equipment
- Location
- Algarve
- Year
- 2026
- Duration
- Ongoing
- Equipment 1
- Split units in all four bedrooms
- Equipment 2
- Ducted climate control in the living room
- Equipment 3
- MVHR unit in a plant area, distributed through the villa
- Equipment 4
- Home automation
- Rooms with dedicated climate control
- 5
The challenge
In a high-end villa built from scratch — four bedrooms upstairs, a large living room downstairs and outdoor social areas — the brief was to combine thermal comfort, indoor air quality and technical integration without the equipment starting to dictate how each room looked.
The work
All the first fix and, later, the installation of the climate systems: split units in the bedrooms and a ducted solution in the living room, each space with the system that suits it. A central MVHR unit — mechanical ventilation with heat recovery — was installed in a plant area and distributed through the various rooms, along with the home automation systems.
The outcome
The villa ended up with climate control, ventilation and automation working as one solution, matched to what each space needed. The mechanical ventilation keeps indoor air renewal under control without relying on open windows.


Want a result like this on your site?
Request a free technical audit — we visit your site and deliver a written report within days.