Hospitality

Chefs on Fire, Vilamoura

Installed equipment

Location
Vilamoura, Loulé
Year
2025
Duration
3-day event
Equipment 1
Two generators, each backing up the other
Equipment 2
Power distribution to the chefs’ stations
Equipment 3
Supply for the stage, lighting and box office
Equipment 4
Technical cover on site throughout the event
Event days with uninterrupted power
3

The challenge

An event on this scale needs a temporary electrical infrastructure able to feed food stations, professional equipment, the stage, lighting, the box office, support areas, toilets and climate control all at once. Beyond the load, the real requirement was continuity: a power cut mid-event has no acceptable recovery time.

The work

King Service took on the installation and power distribution across the site. Two generators were brought in so that a failure on one source would not leave the event without power, and distribution was run to the various points: food preparation stations, stage, lighting, box office and support structures. The team stayed on site for the duration of the event to cover the infrastructure.

The outcome

The infrastructure fed every area across the three days of operation — food, production, lighting, services and support areas. The event ran from 20 to 22 June 2025 and marked the Chefs on Fire debut in the Algarve.

Work delivered for Chefs on Fire, Vilamoura in Vilamoura, Loulé — image 1 of 4Work delivered for Chefs on Fire, Vilamoura in Vilamoura, Loulé — image 2 of 4Work delivered for Chefs on Fire, Vilamoura in Vilamoura, Loulé — image 3 of 4Work delivered for Chefs on Fire, Vilamoura in Vilamoura, Loulé — image 4 of 4

Want a result like this on your site?

Request a free technical audit — we visit your site and deliver a written report within days.